Annex 14 — National Deployment Guide (Requires Authorization)
14.1 Purpose
This annex provides a high-level, non-modifiable National Deployment Guide for VILF deployments at country scale.
Full adaptation of this guide requires explicit written authorization from Doulab due to CC BY-NC-ND restrictions.
14.2 Deployment Phases (National-Level)
Phase 1 — Diagnostic & Readiness (0–6 months)
- National ecosystem diagnostic
- Stakeholder alignment
- Selection of pilot institutions
- Initial NCU formation
Phase 2 — Pilot Labs + First Hub (6–12 months)
- 1–3 pilot labs launched
- One hub operational
- IMM-P® execution cycles
- Repository & evidence setup
Phase 3 — Scaling Pathway (12–24 months)
- Expansion to 3–7 labs
- Multiple hubs functional
- First national MEL cycle
- Benchmarking report
Phase 4 — System Integration (24–36 months)
- Fully operational NCU
- Multi-hub national model
- Mandatory accreditation
- Scorecard cycles institutionalized
Phase 5 — Long-Term Sustainability (36–48 months)
- National maturity progression
- Integration into law or decree (optional)
- Multi-year budget alignment
- Continuous improvement cycles
14.3 National Governance Requirements
- Formal IGF adoption
- Accredited NCU
- Standardized repositories across all labs
- Annual MEL + Benchmarking report
- Sector-specific capability strategies
14.4 Licensing
This annex is non-modifiable under CC BY-NC-ND 4.0. Authorization is required for country-level versioning (e.g., VILF-DR).